Autonomous sweepers
Complete the route.
Recharge for the next shift.
Design automatic charging around depot return, parking and cleaning schedules.
Discuss a project
THE APPLICATION
Autonomous sweepers
Sweeper charging must account for mission energy demand, ground clearance, wastewater and dust exposure. Confirm the vehicle battery, depot docking position and site power before selecting coils and control interfaces.
Campus roads / Industrial sites / Municipal project evaluation
Select around the mission
Configuration is assessed against the robot, battery and installation conditions.
Specifications are reference values for initial selection. Power, separation, voltage and installation conditions must be evaluated together. Final configuration and applicable requirements are defined in the agreed technical specification.
LET’S CONNECT
Start with your application.
Tell us about your equipment, battery and operating environment. Let’s define the right charging configuration.
